NEWS | Victoria

​Cabrini's new Operating Theatres

26th March, 2019

The team from arete’s Victorian Office have recently completed the $2.5 Million expansion of the Cabrini Medical Centre Building 3 Operating Theatres. 

The new 525m2 fitout included a new Orthopaedic Operating Theatre, a New Neurology Operating Theatre and a new recovery bay to assist with the increased capacity for operation procedures.

The accelerated program meant that night shifts were undertaken to successfully complete the full medical fit out which included as a minimum infection control measures, installation of Nurse Call systems, floor to ceiling vinyl and challenging Electrical/AV and Medical Gasses works. Cardiac and Body Protection were used throughout the entirety of the fitout. The extension project saw the instillation of Victoria’s first two AirFrame systems, the in-ceiling system is the back bone of the structure which supports the theatre Pendants, lights and house all airflow and above table lighting. 

Well done to the team for the successful delivery of the MC3 Operating Theatres within the accelerated timeframe.